Tobias Associates PLX - Plate Scanning  System
Close Window Print this Page

EPLEX™ Cost-Analysis Data Computation Sheet
  Enter for Your Operation
(Press the "TAB" key to move between items):
Press billing rate $
(manufacturing cost per hour)
  
Average makeready time
 minutes
Average number of makereadies per day  makereadies
Typical work week
(5, 6, 7 days)
  days
Weeks of operation per year
(50, 51, 52 etc.)
 weeks
 
  Compute potential annual savings available for Makeready Time:
 
Average reduction of makeready time using EPLEX 15
(can expect 10-25%)
 %
 
 
Annual savings for makeready time$
  per year
 
Compute potential annual savings available for
Reduction of Paper Waste
:
Average sheets used per makeready
 sheets
Paper Cost per sheet $
 
 
 
 
Annual Savings for paper
 
Potential annual savings to your operation is: $   

 

- EPLEX Home
- Calculate ROI
- Typical Layout
- Raw Coverage
- Assign Inks
- Ink Catalog
- Paper Catalog
- Key Trim
- Sweep Settings
- Learn Mode
- Set the Press
- Press Survey Form

Product names profiled herein are trademarks of Tobias Associates, Inc. unless otherwise indicated.